Finishes are the part of an interior everyone talks about. Electrical and plumbing are the part everyone forgets — until a switch is in the wrong place or a pipe has to be re-routed behind a finished wall. Planning them first saves money, time and frustration.

Hidden work is the costliest to change

Once tiles, laminates and paint are in place, moving a point means breaking, patching and repainting. Decisions made on paper cost nothing; decisions made after finishing cost a lot.

Electrical: decide these early

  • Points for every appliance — chimney, hob, geyser, AC, washing machine, refrigerator, microwave.
  • Switch heights and groups that match the furniture layout.
  • Dedicated circuits for heavy loads such as ACs and geysers.
  • TV, data and charging points where you will actually use them.
  • Concealed conduits and a clear load plan.

Plumbing: decide these early

  • Sink, RO, dishwasher and washing-machine inlets and outlets.
  • Geyser positions and hot/cold water lines.
  • Drainage slopes and concealed pipe routes.
  • A pressure test on new lines before walls are closed.

The right order of work

  1. Civil and masonry changes
  2. Electrical and plumbing rough-in
  3. False ceiling framework
  4. Carpentry, tiling and flooring
  5. Painting and polishing
  6. Fixtures, fittings and final finishing

Test before you close

Check conduits, wiring and pipes while they are still visible. A photo record of every concealed line is also invaluable years later when you need to drill a wall.